Naval Architecture Virtual Project for Masters Students
Timeline
-
May 19, 2020Experience start
-
May 23, 2020Project Scope Meeting
-
July 9, 2020Mid-point Memo
-
August 29, 2020Experience end
Timeline
-
May 19, 2020Experience start
-
May 23, 2020Project Scope Meeting
Meeting between students and company to confirm: project scope, communication styles, and important dates. NOTE: This project can commence anytime between May 13 - July 17. The key dates would then be adjusted accordingly.
-
July 9, 2020Mid-point Memo
The project team will provide a summary memo of their progress and any issues/changes to date. There should be weekly/bi-weekly check-ins over the entire project period. (Dates will be adjusted as needed for the project start and end dates)
-
August 29, 2020Experience end
Categories
Data analysis Product or service launchSkills
data analysis research hydrostatics & stability engineering designAs a response to the COVID-19 challenge, UBC Naval Architecture and Marine Engineering (NAME) Program has adopted a new strategy for the NAME Internship/Project course. The NAME 592 course emphasizes the teamwork and management skills necessary for excellence in professional design practice. The “design or consulting firm", i.e. team of 1 to 4 students, supported by faculty members and an industry mentor, work on industry-directed projects. Emphasis is placed on disciplined adherence to professional design practices (including planning, scheduling, documentation, risk management, and economics) and a clear focus on the client’s needs, as well as solutions to technical issues.
We are requesting projects that originate from an industrial need, and for which you are willing to act as a client for the student team. All students have undergraduate degrees with 2 years to 10+ years industry experience.
Projects can commence at any time from May 13 - July 17 and end no later than September 8.
Deliverables are determined and outlined by the client - you. They will include, at minimum, a final written document and a formal presentation.This may include design drawings packages, background research findings, data analysis summary, financial summary, beta units of systems, etc. We ask, where possible, list important milestones used to track progress.
Project timeline
-
May 19, 2020Experience start
-
May 23, 2020Project Scope Meeting
-
July 9, 2020Mid-point Memo
-
August 29, 2020Experience end
Timeline
-
May 19, 2020Experience start
-
May 23, 2020Project Scope Meeting
Meeting between students and company to confirm: project scope, communication styles, and important dates. NOTE: This project can commence anytime between May 13 - July 17. The key dates would then be adjusted accordingly.
-
July 9, 2020Mid-point Memo
The project team will provide a summary memo of their progress and any issues/changes to date. There should be weekly/bi-weekly check-ins over the entire project period. (Dates will be adjusted as needed for the project start and end dates)
-
August 29, 2020Experience end
Project Examples
Examples of projects a NAME student group could work on:
Data Analysis
- Machine Learning models predicting fuel consumption for vessels using onboard data and bunker data. These models can be used to create a better understanding on the performance and emissions of the vessel.
- Develop methods for consolidating and filtering data from scattered data sources on board the ship for further analysis.
Green Technology
- Using Flettner rotor or other energy-saving technologies: Influence on a specific feature such as vessel’s stability
- Possibility of using batteries as energy source onboard ships: Influence on structural arrangements, weight, stability etc.
Numerical Analysis
- CFD analysis of vessel’s seakeeping performance or resistance in various wave conditions.
- FE analysis of a structure aiming to determine vibrations, impact strength, etc. Possible comparison with classification society’s rules.
Vessel Design
- Evaluation of catamaran hullforms for short shipping routes.
- Investigation of X series model series data for new cure fit equations.
Companies must answer the following questions to submit a match request to this experience:
Meeting with the students to further define the problem. Ideally, this would take the format of a site visit by the students. However, under the current restrictions, this will need to take place virtually. The visit allows students to better grasp your requirements, and to ask you questions.
In-kind support (design drawings, software, data files, other experts in your firm, etc.) to allow the students to complete the project.
Define the project. The problem description should include an introduction, a project description, expected outcomes, a list of resources available, and a list of customer requirements. If needed, our NAME faculty team will help you refine the problem description, and ensure the projects are feasible within the course scope.
Provide critical assessment of student deliverables, including the midterm report, final report and final design presentation.
Provide a dedicated contact who will act as the students primary industry supervisor who is available to answer periodic emails, phone calls or video conference meetings over the duration of the project to address students' questions. A secondary/alternate contact is recommended as a backup. Students will interact virtually with their primary contact on a weekly or bi-weekly basis (as determined at beginning of the project).
Timeline
-
May 19, 2020Experience start
-
May 23, 2020Project Scope Meeting
-
July 9, 2020Mid-point Memo
-
August 29, 2020Experience end
Timeline
-
May 19, 2020Experience start
-
May 23, 2020Project Scope Meeting
Meeting between students and company to confirm: project scope, communication styles, and important dates. NOTE: This project can commence anytime between May 13 - July 17. The key dates would then be adjusted accordingly.
-
July 9, 2020Mid-point Memo
The project team will provide a summary memo of their progress and any issues/changes to date. There should be weekly/bi-weekly check-ins over the entire project period. (Dates will be adjusted as needed for the project start and end dates)
-
August 29, 2020Experience end